MIRNEWS.188 20 SEPTEMBER 1993 2d Spacewalk (EVA) MIR-Crew: Tsibliyev and Serebrov concluded the installation of the Rapan pillar during a relatively short EVA on 20.09.93 between 0352 and 0705UTC, so 3 hrs and 13 mins. The Rapan is standing perpendicularly on the Kvant-1 module near the the Sofora mast. The Sofora is standing under an angle of 79 degrees and inclines towards the forward side of the complex. The crew installed materials, samples and equipment on the Rapan for an exposure to open space during half a year. After this period the samples etc. have to be returned to earth for analyses. Eventual 3d EVA: After evaluation of today's EVA and an analysis of the TV- images made by the cosmonauts, experts will decide whether there will be needed a 3d EVA. The Russians did speak nor about the inspection of MIR's outer surface and the solarbat- teries neither about the transfer of solarbatteries. If a 3d EVA will be made, this might be on 24.09.93. Chris v.d. Berg, NL-9165/A-UK3202.