MIRNEWS.268 22 JULY 1995 3d Spacewalk (EVA) MIR-19 crew: This EVA took place on 21.07.1995 from 0030-0605UTC. The main task of the crew consisted of the installation of the Belgian Spectrometer, MIRAS, on the outersurface of the Spektr-module. The EVA was a success and the last to be executed by this crew. During the EVA the geostationary satellite Altair (west) has not been used during all possible windows and if so only for voice communications. The recorded images have been trans mitted to earth after the EVA possibly via direct channels or Luch-1. Progress-M28 successfully linked up with MIR: On 22.07.1995 at 0440UTC Solovyov reported 'kasaniye' (touch). During the Altair-window in orbit 53838, so in which the approach and docking took place, only voice communications could be monitored. So no images of the approach. Approach and docking were executed in the automatic mode by the system Kurs. The crew observed the approach of Pr-M28 through portho les. Pr-M28 docked to the forward axial port (-X) of the transition section (P.Kh.O.). At 0630UTC checks of the hard docking and airseal had been completed and the hatch was opened just before 0705UTC. Pr-M28 delivered to the MIR-complex food, water, fuel and scientific equipment. Chris v.d. Berg, NL-9165/A-UK3202.